| Industrial Plant | RMP Validation Exercise Plant [Validation], Italy |
|---|---|
| Type | Storage Tank |
| Code | U03 |
| Substance | Chlorine (7782-50-5) |
| Tank height from the ground | 0 m |
| Volume | 17.04 m3 |
| Surface Roughness | 700 mm (0.7 m) |
| Obstruction Class | Obstructed |
| Status | Operational |
| Shell Density | 7800 kg/m3 |
| Base Type | On-ground |
| Base Support Type | Anchored |
| Construction Material | Steel |
| Storage Volume | 17.04 m3 |
| Storage Capacity | 26682 kg |
| Storage Condition | Refrigerated atmospheric |
| Storage Pressure | 1 atm |
| Gauge Pressure | 0 atm |
| Storage State | Liquid |
| Fill Percent | 85 %v |
| Stored Volume | 14.484 m3 |
| Stored Quantity | 50000 lb (22680 kg) |
| Equivalent Dike Diameter | 5.7034 m |
| Equivalent Dike Length | 5.0545 m |
| Enclosure | Dike |
| Dike Depth | 0.667 m |
| Dike Area | 275 ft2 (25.548 m2) |
| Effective Dike Area | 25.548 m2 |
| Dike Volume | 17.04 m3 |
| Effective Dike Volume | 17.04 m3 |
| Passive Release Mitigation Factor | 1 |
| Active Release Mitigation Factor | 1 |
| Access | Public |
| No | Hazard Type | Name | Date | # Plants | ||
|---|---|---|---|---|---|---|
| 1. | Earthquake | RMP Validation Exercise, Example 3 [Validation] | 2017/04/28 12:51:03 | 1 | Serkan GIRGIN |
Risk Assessment | Natural Hazards | Industrial Plants | Scientific | Users |