| Industrial Plant | RMP Validation Exercise Plant [Validation], Italy |
|---|---|
| Type | Storage Tank |
| Code | U06 |
| Substance | Bromine (7726-95-6) |
| Tank height from the ground | 0 m |
| Volume | 3.518 m3 |
| Surface Roughness | 700 mm (0.7 m) |
| Obstruction Class | Obstructed |
| Status | Operational |
| Shell Density | 7800 kg/m3 |
| Base Type | On-ground |
| Base Support Type | Anchored |
| Construction Material | Steel |
| Storage Volume | 3.518 m3 |
| Storage Capacity | 10673 kg |
| Storage Condition | Atmospheric |
| Storage Temperature | 25°C |
| Storage Pressure | 1 atm |
| Gauge Pressure | 0 atm |
| Storage State | Liquid |
| Fill Percent | 85 %v |
| Stored Volume | 2.9903 m3 |
| Stored Quantity | 20000 lb (9071.8 kg) |
| Equivalent Dike Diameter | 3.4393 m |
| Equivalent Dike Length | 3.048 m |
| Enclosure | Dike |
| Dike Depth | 4 ft (1.2192 m) |
| Dike Area | 100 ft2 (9.2903 m2) |
| Effective Dike Area | 9.2903 m2 |
| Dike Volume | 11.327 m3 |
| Effective Dike Volume | 11.327 m3 |
| Passive Release Mitigation Factor | 1 |
| Active Release Mitigation Factor | 1 |
| Access | Public |
| No | Hazard Type | Name | Date | # Plants | ||
|---|---|---|---|---|---|---|
| 1. | Earthquake | RMP Validation Exercise, Example 6 [Validation] | 2017/04/28 12:51:03 | 1 | Serkan GIRGIN | |
| 2. | Earthquake | RMP Validation Exercise, Example 9 [Validation] | 2017/04/28 12:51:03 | 1 | Serkan GIRGIN |
Risk Assessment | Natural Hazards | Industrial Plants | Scientific | Users |