Risk Assessment

This is an experimental system, made available without commitment to experts in the domain for test and verification. The results produced by this system depend heavily on the data, models and assumptions used, and should not be used for decision making without careful validation of those.

The European Commission does not warrant the accuracy of data or processes in the system, and is not responsible for any damage, loss, or improper decision resulting from its use.

NameRMP Validation Exercise, Example 19 [Validation]
Date2017/04/28 12:51:03
HazardRMP Validation Exercise Earthquake [Validation], 2012/10/21
Industrial PlantRMP Validation Exercise Plant [Validation], Italy
Plant UnitStorage Tank, U19, Diborane (19287-45-7)
Damage ClassificationHAZUS (2010) - Storage Tank
Fragility CurveAuto
Flexible fragility curve selectionYes
Evaluate compatible plant units onlyNo
Use private property estimatorsNo
Hole Diameter2.5 in (6.35 cm)
Notes

Risk Management Program Guidance for Offsite Consequence Analysis (U.S. EPA, 1999), Example 19 (page 7-2).

AccessPublic
1. RMP Validation Exercise Plant [Validation], Italy
NoPlant UnitHazard ParametersFragility CurveDamage EstimateScenario ParametersEnd-point Distance
1.Storage Tank (U19)
Diborane, Base Type: On-ground 
PGA: 0.8 g AR-IAP-120DS2: P(0.9917)Qreleased: 0 kg Insufficient data
DS3: P(0.8648)Qreleased657.64 kg 9.6561 km, P(0.2594)
DS4: P(0.5858)Qreleased657.64 kg 9.6561 km, P(0.2929)
DS5: P(0.403)Qreleased657.64 kg 9.6561 km, P(0.403)
Created: Serkan GIRGIN, 2012/11/18 19:28:23 – Updated: Serkan GIRGIN, 2012/11/21 10:52:23

Risk Assessment

Natural Hazards

Industrial Plants

Scientific

Users