Risk Assessment

This is an experimental system, made available without commitment to experts in the domain for test and verification. The results produced by this system depend heavily on the data, models and assumptions used, and should not be used for decision making without careful validation of those.

The European Commission does not warrant the accuracy of data or processes in the system, and is not responsible for any damage, loss, or improper decision resulting from its use.

NameRMP Validation Exercise, Example 20 [Validation]
Date2017/04/28 12:51:03
HazardRMP Validation Exercise Earthquake [Validation], 2012/10/21
Industrial PlantRMP Validation Exercise Plant [Validation], Italy
Plant UnitStorage Tank, U20, Hydrogen fluoride (7664-39-3)
Damage ClassificationHAZUS (2010) - Storage Tank
Fragility CurveAuto
Flexible fragility curve selectionYes
Evaluate compatible plant units onlyNo
Use private property estimatorsNo
Active Release Mitigation Factor10% (0.1 )
Release Rate660 lb/min (299.37 kg/min)
Notes

Risk Management Program Guidance for Offsite Consequence Analysis (U.S. EPA, 1999), Example 20 (section 7.1.2, page 7-5).

AccessPublic
1. RMP Validation Exercise Plant [Validation], Italy
NoPlant UnitHazard ParametersFragility CurveDamage EstimateScenario ParametersEnd-point Distance
1.Storage Tank (U20)
Hydrogen fluoride, Base Type: On-ground 
PGA: 0.8 g AR-IAP-120DS2: P(0.9917)Qreleased: 0 kg No Consequence
DS3: P(0.8648)Qreleased2993.7 kg 1.9312 km, P(0.2594)
DS4: P(0.5858)Qreleased2993.7 kg 1.9312 km, P(0.2929)
DS5: P(0.403)Qreleased2993.7 kg 1.9312 km, P(0.403)
Created: Serkan GIRGIN, 2012/11/22 11:24:29

Risk Assessment

Natural Hazards

Industrial Plants

Scientific

Users